1

Examine This Report on dowel bar retrofit

News Discuss 
In Seismic types of D0, D1 or D2, having said that, a detailing prerequisite does require a vertical link in between the foundation wall plus the footing each and every four ft on Middle with an ordinary hook inside the footing. This ailment requirement is shown graphically then involving The https://bangkok-wax48147.blogofoto.com/59021112/dowel-bars-in-footing-things-to-know-before-you-buy

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story