As viewed within the figure under, continual auger is accustomed to drill the borehole, raise up drilled soil, and pour concrete although the auger is moved up. Consequently, the borehole will not have to have casing or hydrostatic tension to circumvent harm to the borehole wall. আমাদের কোম্পানিতে দক্ষ সার্ভেয়াররা https://deanpzpfb.blogdosaga.com/32511301/the-best-side-of-cast-in-situ-piles